Mobile Icon

Available 24/7   413-786-8443

Projects

Karl BarbackiExpand Project

Before

72 Congress Avenue Holyoke MA

ONE (1) NEW STEAM HEATING BOILER & COMBINATION GAS/OIL BURNER (project cost of $25,850.00)

Furnish and install One (1) new HB Smith model 19-S4 steam heating boiler with a Power Flame model CR1-GO-10 natural gas burner and two (2) 275-gallon above ground fuel oil tanks.

The Power Flame combination gas/oil burner has a firing rate of 3,753 Cubic Feet an Hour (CFH) natural gas and 3-1/2 Gallons Per Hour (GPH) of #2 fuel oil.

The HB SMITH 4-section, series 19 steam heating boiler has an output of 413,000 BTU/HR.

After

Windsor RealtyExpand Project

Before

173 Elm Street Holyoke MA

ONE (1) NEW COMBINATION NATURAL GAS & #2 FUEL OIL BURNER (Project cost of $11,600.00)

Remove the existing older #2 fuel oil burner. Furnish and install a new Power Flame model CR2-GO-15 combination natural gas & #2 fuel oil burner having a firing rate of 2,049 Cubic Feet an Hour (CFH) gas and 14.20 Gallons Per Hour (GPH) fuel oil.

NOTE: the installation of a natural gas pipe line from the gas meter to the new burner was installed by others..

After

Windsor RealtyExpand Project

Before

177 Elm Street Holyoke MA

ONE (1) NEW COMBINATION NATURAL GAS & #2 FUEL OIL BURNER (Project cost of $11,600.00)

Remove the existing older #2 fuel oil burner. Furnish and install a new Power Flame model CR2-GO-15 combination natural gas & #2 fuel oil burner having a firing rate of 1,703 Cubic Feet an Hour (CFH) gas and 11.08 Gallons Per Hour (GPH) fuel oil.

NOTE: the installation of a natural gas pipe line from the gas meter to the new burner was installed by others.

After

Windsor RealtyExpand Project

Before

149 Essex Street Holyoke MA

ONE (1) NEW COMBINATION NATURAL GAS & #2 FUEL OIL BURNER (Project cost of $12,110.00)

Remove the existing older #2 fuel oil burner. Furnish and install a new Power Flame model CR2-GO-15 combination natural gas & #2 fuel oil burner having a firing rate of 2,049 Cubic Feet an Hour (CFH) gas and 14.20 Gallons Per Hour (GPH) fuel oil.

NOTE: the installation of a natural gas pipe line from the gas meter to the new burner was installed by others.

After

ADAR InvestmentsExpand Project

Before

370 High Street Holyoke MA

ONE (1) NEW NATURAL GAS BURNER (project cost of $8,950.00)

Remove the existing older #2 fuel oil burner. Furnish and install a Power Flame model JR3-A-10 natural gas burner having a firing rate of 910 Cubic Feet an Hour (CFH).

NOTE: natural gas piping from the gas meter to the new gas burner and the boiler room fresh air & exhaust louvers were installed by others

After

Florence Casket CompanyExpand Project

Before

16 Bardwell Street Northampton MA

ONE (1) NEW NATURAL GAS BURNER (project cost of $11,700.00)

Remove the existing older #2 fuel oil burner. Furnish and install a Power Flame model CR3-G-20 natural gas burner having a firing rate of 3,753 Cubic Feet an Hour (CFH).

NOTE: natural gas piping from the gas meter to the new gas burner and the boiler room fresh air & exhaust louvers were installed by others

After

Private School in SpringfieldExpand Project

Before

Springfield MA

TWO (2) NEW COMBONATION GAS-OIL BURNER Installation

Remove the two(2) older oil burners; furnish and install two (2) new Power Flame model C2-GO-20B combination gas-oil burners. Each of the two Power Flame model C2-GO-20B combination gas/oil burners has a firing rate of 3,080 CFH natural gas –OR- 22.00 GPH #2 fuel oil.

After

Plains Elementary SchoolExpand Project

267 Granby Road South Hadley

ONE (1) NEW NATURAL GAS BURNER (Public Bid; project cost of $24,829.00)

Remove the existing older #2 fuel oil burner. Furnish and install a Power Flame model CR3-G-20 natural gas burner having a firing rate of 3,897 Cubic Feet an Hour (CFH).

The installation also included the removal of an underground fuel oil tank and the installation of a natural gas pipe line from the new gas meter to the new gas burner.

After

Southwick-Tolland Jr./Sr. High SchoolExpand Project

Before

93 Feeding Hills Road Southwick MA

BOILER REPAIR (project cost $4,000.00)

Remove the gas burner from the Viessmann Vitocrossal 300 hot water heating boiler. Remove the front boiler section and install new gasket material to stop flue gasses from escaping between the front and rear boiler sections.

After

Covanta EnergyExpand Project

Before

188 "M" Street Agawam MA

Repair of a Power Flame natural gas burner on an incinerator combustor

AFTERBURNER REPAIR: Remove the Power Flamemodel HPGAO-2-E15natural gas burner from one of the three incinerator combustor units and replace its’ refractory ring and gas jet spuds.

NOTE: Clark HVAC Services, LLC services this unique regional trash burning plant that also produces electricity from the waste being burnt. We service and maintain the three (3) Maxon oil burners that are used to initially ignite the waste and we service and maintain the three (3) Power Flame natural gas afterburners that have a firing rate of 25,830 Cubic Feet an Hour (CFH).

After

Cernak BuickExpand Project

Before

102-104 Northampton St. Easthampton MA

ONE (1) NEW STEAM HEATING BOILER & OIL BURNER (project cost of $21,950.00)

Furnish and install One (1) new HB Smith model 28HE-5 steam heating boiler with a new Carlin model 702, #2 fuel oil burner.

The Carlin 702 burner has a firing rate of 10.2 Gallons Per Hour (GPH) of #2 fuel oil.

The HB SMITH 5-section, series 28HE (High Efficiency) steam heating boiler has an output of 896,000 BTU/HR and 3,733 Square Feet of Steam.

After

Kripalu Center for Yoga & HealthExpand Project

Before

57 Interlaken Rd. Stockbridge MA

Four (4) NEW COMBINATION GAS/OIL BURNERS (project cost of $79,500.00)

Remove two (4) old Gordon-Piatt #2 fuel oil burners from the existing 15-section Weil McLain series 88 boilers. Furnish and install four (4) new Power Flame model C3-GO-25B combination natural gas & #2 fuel oil burners in their place.

Firing rate of 4.763 Cubic Feet an Hour (CFH) natural gas and 33.0 Gallons per Hour (GPH) of #2 fuel oil.UL, CSD-1 and MA. Code Approvals

Full Electric Modulation Mode of Operation

Honeywell Control Links parallel positioning Modulation Controller System

Honeywell R7840L microprocessor flame safeguard control with lead sulfide scanner

3.00-HP 208/230V 3-Phase motor

After

Alden Baptist ChurchExpand Project

Before

649 State Street Springfield MA

One (1) NEW NATURALGAS BURNER (project cost of $11,485.00)

Remove one (1) old #2 fuel oil burner. Furnish and install one (1) new Power Flame model CR2-G-20A natural gas burner.

The Power Flame natural gas burner has a firing rate of 2,396 Cubic Feet an Hour (CFH) natural gas.

After

Giggles Garden Learning CenterExpand Project

Before

627 State Street Springfield MA

One (1) NEW NATURALGAS BURNER (project cost of $10,100.00)

Acting as a Sub-Contractor for the McCormick-Allum Company, Inc. in Springfield Mam., Clark HVAC Services LLC removed one (1) old #2 fuel oil burner and furnished and installed one (1) new Power Flame model J50A-15 natural gas burner.

The Power Flame natural gas burner has a firing rate of 2,049 Cubic Feet an Hour (CFH) natural gas.

After

Century InvestmentsExpand Project

Before

73 State Street Springfield MA

ONE (1) NEW STEAM HEATING BOILER & OIL BURNER (project cost of $37,500.00)

Furnish and install One (1) new HB Smith model LO28HE-S-5 steam heating boiler with a new Carlin model 7801CRD, #2 fuel oil burner.

The Carlin 801CRD burner has a firing range of 6.60 low fire, to 19.80 high fire Gallons Per Hour (GPH) of #2 fuel oil.

The HB SMITH 7-section, series 28HE (High Efficiency) steam heating boiler has an output of 1,330,000 BTU/HR and 5,542 Square Feet of Steam.

After

Our Lady of the Valley RectoryExpand Project

Before

33 Adams Street Easthampton MA

FURNISH AND INSTALL A NATURAL GAS CONVERSION BURNER, Project cost $6,900.00

Removed a Carlin #2-oil burner from an HB Smith model 19A-4 steam boiler. Furnished and installed one (1) new Carlin natural gas burner, model 301-GAS. Reconfigured the boilers pressure control piping and installed a fresh air inlet and exhaust air out to meet MA. Fuel Gas Code.

The Carlin 301-GAS burner has a gas firing rate of 520 Cubic Feet an Hour..

After

Corey Briere Business BlockExpand Project

Before

10 Center St. Chicopee MA

ONE (1) NEW NATURAL GAS BURNER (project cost of $17,550.00)

Remove the existing older #2 fuel oil burner. Furnish and install a Power Flame model J50A-15 natural gas burner having a firing rate of 1,703 Cubic Feet an Hour (CFH), complete with the natural gas piping from the new gas meter to the burner.

After

St. Mary's Elementary SchoolExpand Project

Before

35 Bartlett Street Westfield MA

ONE (1) NEW STEAM HEATING BOILER & GAS BURNER (project cost of $29,900.00)

Furnish and install One (1) new HB Smith model HBSG28HE-S-6 steam heating boiler with a new Power Flame model J50A-15 natural gas burner.

The Power Flame gas burner has a firing range of 1,773 Cubic Feet an Hour of natural gas. The HB SMITH 6-section, series 28HE (High Efficiency) steam heating boiler has an output of 1,110,000 BTU/HR and 4,625 Square Feet of Steam.

After

Pioneer Valley Transit AuthorityExpand Project

Before

2840 Main St. Springfield MA

Two (2) New Replacement High-Efficiency Hot Water Heating Boilers (project cost of $75,284.80)

Remove two (2) older natural gas fired boilers. Furnish and install in their place two (2) new Lochinvar model KBN-801 94% efficient natural gas fired hot water heating boilers, complete with new PVC flue vent piping and PVC fresh air inlet piping and reuse & remount the existing main circulators onto the new boilers.

As part of the boiler installation we also furnished and installed twenty three (23) new King ES120-R line voltage thermostats with new electrical wiring between each thermostat and the unit heaters.

The Lochinvar KBN-801 boilers are rated at 800,000 MBH input on high fire with a 752.000 MBH output to the heating system.

After

Cavalier ManagementExpand Project

Before

257-267 East Street Pittsfield, MA

ONE (1) NEW NATURAL GAS BURNER (project cost of $14,800.00)

Remove the existing older #2 fuel oil burner. Furnish and install a Power Flame Low-High-Low firing model natural gas burner model C2-G-20A having a firing rate of 2,499 Cubic Feet an Hour (CFH). The installation also included new boiler steam pressure controls and a non-motorized boiler room exhaust louver assembly.

(Note: natural gas piping and atmospheric vent piping was excluded; the customer had the natural gas piping from the new gas meter to the new burner installed by others.)

After

Central Chambers Realty TrustExpand Project

Before

16 Center Street Northampton MA

ONE NEW STEAM HEATING BOILER (project cost of $46,000.00)

Clark HVAC Services performed a total building heat gain on analysis on the existing steam radiators and the calculations showed the existing boiler rated at 47 boiler horsepower was too large for the building.

Clark HVAC Services furnished and installed in its place one (1) new HB Smith model HBSG19HE-S-8 high efficiency steam heating boiler rated at only 32 boiler horsepower complete with a new Power Flame model JR50A-15 natural gas burner and a Skidmore 49-gallon condensate receiver tank system.

NOTE: The building owner, at their own expense, contracted with a licensed asbestos apartment company for the removal of the existing 23 year old HB Smith model 28A, 7-section steam boiler and related asbestos covered piping.

After

Channing Bete Co. One CommunityExpand Project

Before

South Deerfield MA

Two (2) New Replacement High-Efficiency Hot Water Heating Boilers (Project cost of $65,600.00)

Furnish and install in their place two (2) new Lochinvar model KBN-701 94% efficient natural gas fired hot water heating boilers, complete with new PVC flue vent piping and PVC fresh air inlet piping and reuse & remount the existing main circulators onto the new boilers.

Each Lochinvar KBN-701 boiler is rated at 700,000 MBH input on high fire

After

Olive Street Development, LLCExpand Project

Before

24 Franklin Street Greenfield, MA

ONE (1) NEW NATURAL GAS BURNER (project cost of $13,950.00)

Remove the existing older #2 fuel oil burner. Furnish and install a Power Flame Low-High-Low firing model natural gas burner model J50A-15 having a firing rate of 1,764 Cubic Feet an Hour (CFH) of natural gas. The installation also included new boiler steam pressure controls and a non-motorized boiler room exhaust louver assembly.

(Note: natural gas piping and atmospheric vent piping was excluded; the customer had the natural gas piping from the new gas meter to the new burner installed by others.)

After

Our Lady of the Valley Daycare CenterExpand Project

Before

35 Pleasant Street Easthampton, MA

ONE NEW STEAM HEATING BOILER SYSTEM (project cost of $63,740.00)

This project was for invited bidders by the Diocese of Springfield, on plans & specifications by Robert Hall Consulting Engineers that Clark HVAC Services won as the low bidder.

Clark HVAC Services furnished and installed one (1) new HB Smith model G28HE-6 high efficiency steam heating boiler with a new Power Flame model JR50A-15 natural gas burner and a Shipco 71-gallon condensate receiver tank system.

NOTE: The Diocese of Springfield , at their own expense, contracted with a licensed asbestos apartment company for the removal of the existing steam boiler and related asbestos covered piping.

After

Former Florence Community CenterExpand Project

Before

140 Pine Street Florence MA

ONE NEW STEAM HEATING BOILER (project cost of $33,900.00)

Clark HVAC Services as a subcontractor to MJ Moran Co., sold and installed the boiler, condensate receiver tank and the gas burner and MJ Moran Co. installed all the steam piping and natural gas piping.

MJ Moran Co. performed a total building heat gain on analysis on the existing steam radiators and the calculations showed the existing boiler were way too large for the building. After a year of running the new heating system Mr. Gougeon called Clark and said his fuel savings were unbelievably low compared to what the City of Northampton used to pay to heat the building with the two (2) old boilers

Clark HVAC Services furnished and installed in its place one (1) new HB Smith model HBSG19HE-S-7 high efficiency steam heating boiler complete with a new Power Flame model JR30A-12 natural gas burner and a Skidmore 49-gallon condensate receiver tank system.

NOTE: The building owner, at their own expense, contracted with a licensed asbestos apartment company for the removal of the two (2) existing steam boilers and related asbestos covered piping.

After

Apartment BuildingExpand Project

122 Central Street Springfield MA

NEW STEAM HEATING BOILER SECTIONS (project cost of $12,800.00)

NOTE #1: The existing Weil McLain steam boiler was only 10 or 11 months old that was installed by others that ran out of water on New Year’s Eve afternoon, it overheated and caused all the cast iron boiler sections to crack.

Clark HVAC Services, located replacement boiler sections in Boston, MA. and sent two of our technicians out there to pick it up.

Clark HVAC Services furnished and installed on Tuesday January 1, 2013 six (6) replacement Weil McLain series 80 cast iron boiler sections consisting of one (1) front section, one (1) rear section and four (4) intermediate sections. Furnished and installed at the same time one (1) new McDonnell-Miller #47-2 combination low water cutoff / boiler water feeder and one (1) HydroLevel #45-550 probe type low water cutoff having a test switch and manual reset switch.

Reconnected the new boiler section block into the existing steam riser/header piping and condensate return water piping. Reused and reconnected the existing boiler pressure controls onto the boiler block with brass siphon pigtails. Reuse and reconnect the existing Carlin model 301-GAS burner onto the boiler block and reconnected into the existing gas piping and electrical wiring. Reconnected the boiler blocks flue gas discharge port into the existing chimney.

The heat to ths building was turned back on by 5:00PM New Years Day

After

Holyoke Day Nursery SchoolExpand Project

Before

159 Chestnut Street Holyoke MA

ONE NEW STEAM HEATING BOILER (project cost of $46,000.00)

Clark HVAC Services performed a total building heat gain on analysis on the existing steam radiators and the calculations showed the existing boiler was too large for the building.

Clark HVAC Services furnished and installed in its place one (1) new HB Smith model HBSG19HE-S-6 high efficiency steam heating boiler rated at only 32 boiler horsepower complete with a new Power Flame model JR30A-10 natural gas burner and a Skidmore 49-gallon condensate receiver tank system.

NOTE: The building owner, at their own expense, had contracted with a licensed asbestos apartment company for the removal of the existing very old originally coal fired HB Smith series 27 steam boiler and related asbestos covered piping.

After

Curry HondaExpand Project

Before

767 Memorial Drive Chicopee, MA

ONE (1) NEW NATURAL GAS BURNER (project cost of $7,350.00)

Disconnected & removed the existing Uni-Power gas burner from the existing paint booth heat exchanger in the ASI Paint Booth. Furnished and installed one (1) new Carlin 301 natural gas burner; model 993124HFRM.

Inspected internals of the heat exchanger following burner removal. Connect the new burner into the existing electrical wiring circuits. Furnished and installed a new Carlin 301 burner and burner mounting plate.

After

Saint Thomas of the Apostle ParishExpand Project

Before

89 Pine Street West Springfield, MA

Two (2) New Replacement High-Efficiency Hot Water Heating Boilers and indirect water heater (Project cost of $47,000.00)

Furnished and installed: Two (2) 96.0% DOE, AFUE rated Lochinvar Knight XL series boilers, model KBN-286. Each boiler unit shall be rated for a natural gas firing rate of 57 CFH minimum, to 285 CFH maximum inputs with cascading sequencing between the two boilers.

Reconfigure the existing 3-zone heating system supply & return mains into a “primary-secondary” piping system reusing the three (3) existing B&G circulators and their relays & controls. Each boiler shall also be equipped with its own “boiler” circulator, w/ Y-strainer, condensate pump and neutralizer. Furnish and install on the system side, one (1) of each of the following: expansion tank; B&G pressure reducing valve; backflow preventer; Spirovent air/dirt eliminator.

Furnished and installed one (1) Superstore 45-gallon indirect water heating tank. Furnished and installed the following additional domestic hot water components with the indirect tank: temperature-pressure relief valve; vacuum breaker; B&G NRF-36 circulator pump; B&G 1” flow check valve; thermal potable water expansion tank; pipe, valves and fitting to connect into the new Lochinvar boiler primary-secondary piping system.

After

Colebrook Realty ManagementExpand Project

Before

293 Bridge Street Springfield, MA

ONE (1) NEW NATURAL GAS BURNER (project cost of $11,460.00)

Disconnected & removed the existing Carlin 1050-FFD oil burner from the existing Weil McLain model 1188 steam heating boiler and install one (1) new Power Flame natural Low-High-Low gas firing burner; CR3-G-20

Replaced the ½” NPT pressure control siphons and add a Low-High-Low firing rate controller pressure control. The existing low water cutoff controls and limit pressure controls comply with the current Massachusetts 522-CMR Board of Boiler Rules and were tested for proper operation and reused.

Reconnect the new burner into the existing electrical wiring circuits. Test fire the new burner and adjust for maximum combustion efficiency.

After

Reed Apartments LLCExpand Project

Before

24 Franklin Street Greenfield, MA

NEW HIGH EFFICIENCY STEAM HEATING BOILER (project cost of $41,300.00)

Clark HVAC Services furnished and installed one new HB Smith High Efficiency steam heating boiler model HBSG19HE-S-10 complete with all new boiler low water cutoff controls and pressure controls.

The new boiler unit is rated in accordance with the Hydronic Institute Testing and Rating Standard for Heating Boilers, and shall be performance tested and listed by I=B=R at +0.10 ins. water draft as follows:

Natural gas input firing rate of 1,754 Cubic Feet an Hour
I=B=R Gross MBH Output: 1,424- (1,424,000 BTU/Hr.)
I=B=R Net Steam MBH: 1081 – (1,081,000 BTU/Hr.)
I=B=R Net Square Feet of Steam Rating: 4,504 (with 33 percent pickup / piping allowance)
Boiler Horsepower: 42.5 BHP

Furnished and installed at the same time one (1) new Skidmore 49-gallon condensate receiver tank with duplex pumps.

Reconnected the new boiler into the existing steam riser/header piping and condensate return water piping. Reused and reconnected into the existing gas piping and electrical wiring. Reconnected the boiler flue gas discharge port into the existing chimney.

After

Colebrook Realty ManagementExpand Project

Before

175 Main Street Northampton, MA

ONE (1) NEW NATURAL GAS BURNER (project cost of $14,900.00)

Disconnected & removed the existing Peabody Gordon Piatt natural gas burner from the existing American Standard model PFA-515 steam heating boiler, furnished and installed one (1) new Power Flame natural modulation natural gas firing burner, model C2-G-20A in its’ place.

Custom fabricated a new burner-to-boiler adapter mounting plate and mount the new burner to the boiler. The existing low water cutoff controls and limit pressure controls were tested for proper operation and reused. Installed a high exhaust air louver into the existing low ducted fresh air inlet sheet metal ductwork.

Provided the services of a MA. licensed & insured electrician to reconnect the new burner into the existing electrical wiring circuits and obtained a permit from the City of Northampton. Provided the services of a MA. licensed & insured gasfitter to reconnect the new burner into the existing natural gas piping system and obtain a permit from the City of Northampton.

Reconnected the new burner into the existing electrical wiring circuits. Test fire the new burner and adjust for maximum combustion efficiency.

After

First Baptist ChurchExpand Project

Before

760 Main Street Agawam, MA

ONE (1) NEW COMBINATION GAS/OIL BURNER (project cost of $24,600.00)

Disconnected & removed the existing Carlin oil burner from the existing 9-section HB Smith series 350 hydronic heating boiler and install one (1) new Power Flame combination gas/oil burner; model C2-GO-20B.

Brush & vacuum cleaned the boiler and open and clean the existing low water cutoff controls. Connect the new burner into the existing electrical wiring circuits. (Note: the existing boiler limit & operating controls were tested for proper operation and reused). Furnish and install a new HB Smith preform refractory combustion chamber.

Furnished and installed a boiler room exhaust louver into the existing fresh air inlet sheet metal duct work. Furnish and install a flue gas spill switch on the existing barometric damper, interlocked into to new burner.

Provided the services of a Massachusetts licensed plumber/gas fitter to remove the cast iron and steel coupling fittings on the existing 3-inch NPT gas line and replace with malleable iron fittings. Pressure test the gas line after repairs are made and then had the Town gas inspector inspect and approve this gas line. Upon completion of the Town inspection the gas line was reconnected to the gas meter and the new gas burner

Reconnected the new burner into the existing electrical wiring circuits. Test fire the new burner and adjust for maximum combustion efficiency.

After